The fiber optic connection |
||||
![]() |
The Silica Networks existing fiber (yellow line) in the region of Mendoza - San Rafael - Santiago. The Observatory will be connected by new fiber to the place called Válvula 9.
|
|||
![]() |
The path of new fiber between Válvula 9 (VB9) and Malargüe (red line), along the road 40. The site of the Observatory is indicated by a black line
|
|||
The optical fiber (about 200 km long) was ordered by Silica Networksto the Chinese firm "Wuhan Fiberhome International Technologies Co. Ltd". |
||||
![]() |
Delivery of the rolls of fiber in Buenos Aires in June 2009. Each roll is 4 km long.
|
|||
![]() |
The rolls of fibers in the storage place of Silica Networks in Buenos Aires. |
|||
![]() |
The rolls of fibers in the storage place of Silica Networks in Buenos Aires. |
|||
![]() |
Roberto Guillán, Giorgio Matthiae and Fernando Liello in the storage place of Silica Networks in Buenos Aires (November 2009). |
|||